top of page


Case Study: Gloucester Waterways Museum Phased Delivery & Bespoke Pontoon Integration
The Canal & River Trust required an improved and inclusive water access solution at Gloucester Waterways Museum to support paddlers, community groups and wheelchair users. The solution needed to integrate with an existing Low Profile Walcon pontoon, which had recently been modified as part of wider upgrade works at the site. The Pontoon & Dock Company was appointed to assess the site, advise on suitable solutions and deliver a modular pontoon system that could be integrated w
BLOG
bottom of page
